PARTICIPATION GUIDE
Enjoy the experience
Participation procedure for exhibitors of Smart Construction Expo.
Contact the secretariat (smartconexpo@esgroup.net) if have any problems.
STEP 1
Exhibitor Page
Sign-up and Login
STEP 2
Fill out Online Application
(Booth and Facilities)
STEP 3
Approval of Secretariat
Receipt of Invoice
STEP 4
Payment of
Deposit and Balance
- For the booth assignment, full balance payment and the application form are required.
- The entry fee will not be returned once paid, and it may be rolled over under the cancellation regulation.

You can download by entering the information below.
Exhibitors should employ the contractors designated by venue for the construction and erection of their stands.

Included in Booth
Space only (3m x 3m per 1 booth)
Organizer will construct the standard booth

Included in Booth
Booth space (3m x 3m per 1 booth) + Back walls, carpet,
(1) table, (1) chair, (3) spot lights, (1) 220V outlet
Electricity (VAT excluded)
Classification | Cost | Unit |
Single-Phase(220V) Electricity Three-Phase(380V) Electricity | USD 110 | kW |
24 Hour Supply Electricity | USD 110 | kW |
Rigging Electricity | USD 110 | EA |
Electricity for booth types
- Raw Space: Must apply for electricity as much as necessary
- Standard Booth: Fundamental electricity for lighting provided, additional electricity must be applied
Additional Service (VAT excluded)
Classification | Cost | Unit |
Internet Line | USD 220 | Port |
Water & Drainage | USD 220 | EA |
Compressed Air | USD 220 | EA |
Visitor's badge bar-code reader | USD 220 | EA |
Visitor’s badge bar-code Reader : It scans bar-code printed on the visitor’s badge. The bar-code contains visitor’s information. Information data will be available within 1~2 weeks at the end of the exhibition.
- Include Information: Name, Position, Contact number, E-mail, and survey response (This may include missing information, misplaced information)
Payment Deadline
Classification | Cost | Unit |
Deposit | 50% of Total Payment | Within a week after application submission |
Balance | 50% of Total Payment | By the date Secretariat announces |
- For the booth assignment, full balance payment and the exhibitor registration form are required.
- The entry fee will not be returned once paid, and it may be rolled over under the cancellation regulation.
Bank Detail
Bank | Industrial Bank of Korea / Gasan Fashion Town Branch (Bank Address : 6 Daerung Post Tower 50-3, Gasan-dong, Geumcheon-gu, Seoul, Korea) |
Swift Code | IBKOKRSEXXX |
Account No | 541-036291-01-011 |
Beneficiary | MESSE ESANG Co.,Ltd |
Beneficiary Address | ES Tower, 9, World Cup buk-ro 58-gil, Mapo-gu, Seoul, Korea |